CORPORATE WORK
SEGE Group: Energy · Construction · Data Center
Explore investment development, energy, construction and data center work through the existing capabilities and project records.
Explore corporate work
CONSTRUCTION CONTRACTING · ENERGY · INVESTMENT DEVELOPMENT
SEGE Group brings construction contracting, energy and digital infrastructure investment under one delivery structure, from site selection through acceptance. Its portfolio spans 65 project records across six sectors in Türkiye, Djibouti and Georgia, representing 1,024 MW of energy projects.
SEGE GROUP
Corporate work and technology projects are presented as distinct areas of expertise, with their own routes and focus.
CORPORATE WORK
Explore investment development, energy, construction and data center work through the existing capabilities and project records.
Explore corporate workAI COMPANIES
Our AI products sit under AI Work School: AskThousand, PlanCatch, Hestia Data, SimEnergy and BeniSil.
See the companies65
Project records
6
Sectors
3
Countries: Türkiye, Djibouti, Georgia
1,024MW
Energy portfolio · development records included
What we do
We manage the route from investment decision to acceptance without breaking it into disconnected parts. Wherever we take a project over, we produce a solution that works on site.
On public and private buildings we run site organisation, quality control and handover as a single process. The work we completed in Djibouti, from ministry buildings to military compounds, shows our ability to set up a logistics and manufacturing chain far from home.
We work on both the development and construction side of solar, wind, hydropower and biomass projects. At the Kuzuoglu Solar Power Plant we held the construction and site-delivery role.
From energy recovery on drinking-water lines to hydropower plants, we sit on both the engineering and the execution side of water infrastructure. Twelve hydropower records across the Black Sea and Aegean regions are held in our portfolio.
For data centre investments serving AI workloads, concept development, technical planning and authority coordination are carried out through SEGE 53 Enerji. This work is at development stage.
Portfolio
From construction to solar, wind, biomass, water-energy recovery and digital infrastructure, every project we have delivered or are developing sits in one list, with its stage and our role stated.
How we work
We assess technical options, grid and permitting conditions and site realities together.
A buildable project structure and the authority process are settled at this stage.
Site organisation, manufacturing, assembly and quality control sit under one responsibility.
A project is not finished until testing, acceptance and documentation are complete.
Structure
Group companies and the AI companies under AI Work School are presented separately.
Construction contracting, international building works and investment development.
segegroup.com ↗ Visit siteDevelopment, permitting and authority processes for energy and digital infrastructure projects.
sege53.com ↗ Visit siteProject development, engineering, technical coordination and construction.
su-grup.com ↗ Visit siteManufacture and export of paper-based masking and protection products.
sugruppackaging.com ↗ Visit siteEnergy-integrated AI data centres and project development.
nollelektrik.com ↗AI WORK SCHOOL COMPANIES
Our AI and digital products are built under AI Work School. Each product below is an AI Work School company.
Parent company · Practical AI-at-work training, exam preparation and certificate programmes.
aiworkschool.com ↗Test your product with 1,000 simulated buyers before you launch.
askthousand.com ↗From a building drawing (DWG/DXF): conflict report, walkable 3D model and quantity take-off.
plancatch.com ↗Field data collection in Türkiye: photo and video, official documents, local market data and AI datasets.
hestiadata.net ↗An energy-tycoon game: build solar, wind, hydro and biogas plants.
simenergygame.com ↗Tools for digital-footprint and personal-data awareness.
benisil.net ↗Contact
Write to us directly to clarify scope and programme. Our technical team responds within the same week.